PROJECT GALLERY
CASE WESTERN RESERVE UNIVERSITY RESIDENCE HALL
CLEVELAND, OHIO
Supply and installation of structural steel frame (580 Tons), precast hollow core plank (126,000 sq. ft.) and miscellaneous metals for the 5 story student housing project. Project consisted of supplying detail drawings and connection design for the Girder-Slab (G-S) system, an integrated precast hollow core plank and steel framing design, which was utilized to maintain the low floor to floor heights required for the facility. This is the first structure in the area to utilize the innovative Girder-Slab system. Structural steel framing included columns, beams, moment frames, specialized G-S D-beams, galvanized tube steel mechanical screening and brick relief angle on all elevations. Miscellaneous metals work was comprised of multiple egress stairs and railing, interior railing, canopy support steel and roof davits.
charter steel melt shop
cuyahoga heights, OHIO
Addition included a one bay building and overhead crane runway extension to an existing building with an overall height of 120’. FCE’s scope included furnishing and installing 150 tons of structural steel with truss work, miscellaneous metals, metal siding and roof deck.
cleveland clinic expansion
avon, OHIO
Erect 1,735 tons of structural steel, metal deck, shear studs, elevator support steel and stairs for the new 8 story bed tower addition to the existing Family Health Center, including the tie in link to the existing facility and associated interior reinforcing. FCE also provided all temporary stair access, cranes, personnel and material hoists and operators.