RTA Train Station Little Italy – Cleveland, Ohio

SubContract precast Erection Ohio

The project consisted of moving an existing bridge to allow for the installation of a new head house for the trains. FCE’s scope included structural steel for the head house, reinforcing of the relocated bridge, miscellaneous metals and ornamental metals. The most notable feature is the stainless steel panels that arch in different directions with different radii making for an intricate and complicated installation.